Tuesday, February 28, 2012

Well, Music Happened

I'm going a little off schedule, but I had a musical epiphany and I've been working on that. I still hope to have the layouts at least sketched by Wednesday.

Sunday, February 26, 2012

Just a Quick Update

I'm working diligently on layouts today. I hope to get through eight or so before taking a break. My goal is to have my layouts done by Wednesday for scanning, so wish me luck.

Wednesday, February 22, 2012

Super Temporary Work Reel

This is a very temporary work reel. I'll be uploading again when I composite the shot of Eithne entering the hut. There are 3 boards missing at the climax, as I changed it a bit, but those will come soon.

Shot Checklist and Post-Pro. Schedule

The blank version of my shot checklist, based on one by Matt DeWater.


Crann Bethadh
Post-Production Plan

Schedule
·      February 22- Work Reel ready for presentation, Blog updated
·      February 29- All layouts drawn, scanned, and uploaded to blog; begin compositing 2 seconds of shot 10 for proof of concept and keying S 1-9 & 11-14;
·      March 1- Completed proof of concept uploaded to blog; have keys for shots 1-9 & 11-14; begin keying S 15-28
·      March 4-11- ROUGHS ALL WEEK LONG, all shots; when not roughing, coloring backgrounds, Have shots 1-9 tied down, work on sound
·      March 14- Blog updated; update work reel, Have shots 10-28 tied down, begin final line
·      March 21- work on final line and start coloring
·      March 28- Begin compositing completed scenes in AfterEffects, work on final line and continue coloring
·      April 4-, work on final line and continue coloring; continue compositing
·      April 11- Have completed film ready to allow cushion. Things WILL go wrong. Also organize everything for Production Book and Data Disc
·      April 25- FINAL PRESENTATION-
o   Present project on playable disc (3 copies)
o   Have data disc (3 copies)
§  Contains everything from proposal and pre-production work-final work reel
o   Have Production Book
o   Blog updated
Process
§  Traditional Roughs, tie-down, and final line.
§  GarageBand and ProTools for sound
§  Dragon shoot final-line
§  Photoshop color
§  AfterEffects composite
Electronic Press Kit will include:
§  Film synopsis
§  Personal statement
§  My contact information
§  Stills from the production
§  Link to production blog

Good News Everyone

I just set up an account on Withoutabox. Click the link below to view the project page.

https://www.withoutabox.com/03film/03t_acc/03t_view_entities/03t_view_project.php?film_id=4576436&gopage=7

Monday, February 13, 2012

Quick Test

This is a quick test for Eithne entering the hut where life is being kept. I just wanted to get a good feel for how her fingers would move.